JapaneseChinese
 
Investment News Trade Mission Available Industrial Land For Lease / Sale In Negeri Sembilan By Industrial Areas Available Ready - Built Factories For Lease/Sale In Negeri Sembilan - By Industrial Areas
               
NSIC 2010 年活动日程
 
NO.
DATE
PROGRAM
REMARKS
1.
2010年1月25 日

访问Emerson Process Management (M) Sdn Bhd, Nilai Industrial Estate

-
2.
2010年2月9日

访问Ecooils Processor (M) Sdn Bhd at Nilai Utama Enterprise Park.

-
3.
2010年2月11日
访问 A1 Glove Sdn Bhd at Nilai Industrial Estate.
公司已购买Dongwha Furniture (M) Sdn Bhd楼
4.
2010年2月23日
在Berjaya Timesquare Hotel, Kuala Lumpur进行国内投资研讨会
由 MITI, MIDA & SME Corp. 组织
5.
2010年3月11日
访问NXP Semiconductor (M) Sdn Bhd, Tuanku Jaafar Industrial Estate, Sg.Gadut
-
6.
2010年3月12日
访问Sehwa Electronics (M) Sdn Bhd at Tuanku Jaafar Industrial Estate, Sg. Gadut
-
7.
2010年3月16日
在Techpark@Enstek, Nilai 进行Coca-Cola Bottlers 破土动工仪式
-
8.
2010年3月24日
访问SKF Bearing (M) Sdn Bhd at Nilai Industrial Estate.
-
9.
2010年4月1日
访问Rembau Crystal Sdn Bhd at Rembau, Negeri Sembilan
-
10.
2010年4月6日
NSIC – 展开项目,在Nilai.
地点: SKF Bearing (M) Sdn Bhd
时间: 2:30 pm
11.
2010年5月
森美兰州投资代表团到韩国汉城
T.B.A
12.
2010年6月
在KL进行投资森美兰项目研讨会
T.B.A
 
Hua Yan 开始了4千5百万马币金额的发展项目 - Senawang Link

企业介绍:

Hua Yang是位于Senawang Link的一个新工业区,本月开始建筑面积为28英亩的项目。第一阶段,将会建设22所结构为一个半层的排房式工厂,
每所工厂面积在2172平方英尺到3005平方英尺之内,于2013年完成。以25.1万马币价格出售。
 
Coca – Cola Bottlers (M) Sdn Bhd 破土动工仪式 @Enstek, Negeri Sembilan

两种重要条件,即紧张的时间表和有吸引力的后勤成本促使Coca – Cola Bottlers (M) Sdn Bhd把生产基地建立于Enstek Industrial Park, Nilai。预计在2010年年底开始生产。

Date : 16 March 2010 (Tuesday)
Time : 2.30 pm
Venue : Enstek Industrial Park, Nilai

By EUGENE MAHALINGAM
eugenicz@thestar.com.my

The Coca-Cola Co is setting up a 123,024 sq m bottling plant at Bandar Enstek’s techpark in Nilai due to attractive logistics costs and a “tight timeline.”

In an e-mail to StarBiz yesterday, Coca-Cola Pacific Group communications director Kenth Kaerhoeg said: “Our selection of location was mainly driven by a list of criteria, including transportation/logistics costs for raw materials and finished products and ready to develop freehold land with a tight timeline to have the plant operating by end-2011.”

He said that after conducting comprehensive studies of alternative locations, the beverage giant reached a “very strong conclusion” on having the plant located close to Kuala Lumpur and Port Klang. “Also we have good water and electricity source and suitable environment.”

Coca-Cola had a ground-breaking ceremony, graced by Prime Minister Datuk Seri Najib Razak, at the site yesterday to officiate the construction of the plant.


从左: Coca-Cola Bottlers Malaysia Sdn Bhd 总经理 Vamsi Mohan 与 Glenn Jordan, Datuk Seri Najib Razak和 森州 Mentri Besar Datuk Seri Mohamad Hasan 进行关于公司Bandar Enstek新装瓶厂的研讨

It hopes to have the plant operational before the transition agreement with Fraser & Neave Holdings Bhd (F&N) expires in September 2011.

“With the ground-breaking today (yesterday), the construction will commence straight away in order to have the plant operational in time for 2011 when we take over from our current bottler, F&N,” said Kaerhoeg.

He said the Malaysian beverage market had great growth potential for Coca-Cola. “More than 60% of the population is under 30 years old and this is an important indicator for a beverage market that is still underdeveloped.”

Kaerhoeg declined to reveal what was the company’s share in the local beverage market. “We do not disclose market share for individual markets,” he said.

At the event yesterday, Coca-Cola Pacific Group president Glenn Jordan said the beverage company would be investing more than RM1bil in Malaysia over the next five years to boost its presence in South-East Asia. “Our planned investment includes a new greenfield plant and its associated equipment, sales and merchandising assets, production innovation, in-market activations, sales infrastructure and marketing.”

The plant was expected to create 600 to 800 new jobs, he said, adding that more than 90% of raw materials would be sourced locally.

“Economic impact studies from our other markets indicate that each job in the Coca-Cola system creates 10 additional jobs at the supplier, distributor and trade levels. As a result, we expect to create 6,000 to 8,000 jobs overall.”

 
访问 Sehwa Electronics (M) Sdn Bhd


前排从左:  Siti Salwa (NSIC)女士, En. Harun Elik (州长, MIDA), Dato’ Lee Sang Bai (马来西亚三星集团总裁), En. Shahrul Azamin (董事长,NSIC),  Lee Sung Hoon先生 (总经理,Sehwa 电子) & En. Md Khir (高级经理, 三星)

Sehwa电子有限公司选择Tuanku Jaafar工业园区作为薄膜晶体管 /液晶电视框架的生产基地,主要供应三星集团,
Sehwa电子有限公司的107名工人在森州自2009年9月已开始生产工作。

 
国内投资研讨会

时间: 2010 223
地点: Berjaya Timesquare Hotel, Kuala Lumpur



NSIC参加了MIDA & SME Corp于2010年2 月23日在Berjaya Timesquare Hotel, Kuala Lumpur举办的国内投资研讨会。研讨会的目的是提供有关政府政策,鼓励和设施 的最新更新,且强调和宣传在服务行业现有的投资机会。研讨会期间,NSIC为宣传此投资项目展开了平台,同时对潜在投资者提供了在森美兰州投资的新机会。



 
MALAYSIA NEW ZEALAND CHAMBER OF COMMERCE (MNZCC) COURTESY VISIT TO NEGERI SEMBILAN

马来西亚,新西兰商会访问森美兰州
时间:2009年11月18日,星期三




图中: Y.A.B. Dato’ Seri Utama Haji Mohamad bin Haji Hasan, 森美兰州首席州长 (从左第十) 与马来西亚,新西兰商会代表团一起


图中: YB. Dato’ Haslah bin Amin,  Menteri Besar Incorporated (MBI)董事长与 森美兰州州政府代表们和马来西亚,新西兰商会代表团一起



图中: Mr. Shahrul Azamin bin Abdullah, 森美兰州投资中心总经理 与 Tn. Hj. Zaharudin bin,Enstek TH-Properties公司董事长和马来西亚,新西兰商会代表团一起,在Enstek@Techpark Sales Gallery

图中: 在Port Dickson 的研讨会


图中: 与森美兰州首席州长在Royale Bintang Hotel, Seremban共进午餐


图中: 与森美兰州首席州长交换纪念品
 
Pertanian Pertiwi’s的扩建工程

Pertanian Pertiwi Sdn Bhd, 是加工清真鸡肉(品牌:Ayam 5 Star)的制造商之一,位于Senawang Industrial Estate。现用面积为4英亩的土地扩大工厂规模,为此投资有6~7千万马币。新工厂将聘请200名员工,于2010年4月完成。

研讨会第二届全国光伏会议

时间 : 20091117

地点 : MARRIOT HOTEL, PUTRAJAYA



NSIC 已参加2009年11月17日在Marriot Hotel, Putrajaya 举行的第二届全国光伏会议. 此次活动包括关于光伏产业发展的会议,像Sunpower, First Solar and Q-Cell 的几家公司出席,和电视产品及技术的展览。第二届全国光伏会议是一件极好的盛事,促进当地于国外光伏公司的网络事业。
因此,它成了NSIC参加此次活动来代表森美兰州政府吸引国内外光伏业投资者的很好的舞台。


能源,绿化科技和水利部长,Dato Seri Peter Chin Fah Kui 活动中访问NSIC平台

  

NSIC平台

  

 
Jotun 破土动工仪式

日期 : 200999  (星期三)

时间 : 909 am

地点 : Nilai Industrial Estate, N.Sembilan



2009年9月9日, Jotun Malaysia现代化涂料厂破土动工仪式隆重举行。森美兰投资中心总经理Shahrul Azamin,森美兰投资中心前任总经理Hj Ramli Othman,挪威贸易理事会代表和Jotun人员目睹了仪式。当日早晨9:09,九位重要人士种植九棵芙蓉花(马来西亚国花)来象征了LIGER项目建设的开始。


Peder Bohlin先生, Mr Ulf Hansen先生,Mr Steve Meanwell先生, YAM Tunku Dato’ Seri Shahabuddin Bin Tunku Besar Burhanuddin, K Sothinathan先生, Low Keh Teong先生,先生Lee Kum Chin, 先生Lim Kim Seng, Ronnie Ooi先生.


破土动工仪式中的Jotun 职工和 客人

这是一个规模为9.3万平方米的绿色地段。位于Nilai Industrial Estate,由于靠近南北高速公路,北部与吉隆坡/Shah Alam,南部与新加坡连接,且具有优良的基础设施和服务,成了LIGER项目开展的最佳选择。Jotun为LIGER项目投资了1.55亿马币,完成项目的目标日期为2010年12月。

 
 
 
 
 
 
Copyright © 2006 Negeri Sembilan Investment Centre